This customer had a partially finished basement which they were ready to complete by adding a full bathroom and a laundry area. The bathroom was completed with not only a brand new shower, toilet and sink install but with Millcreek flooring and our Everlast WallSystem. To complete the rest of the basement we used that same Millcreek flooring throughout, Zenwall Paneling system and also installed a new drop ceiling.
Before
Unfinished portion of basement
Partially Finished Basement
Partial finished basement
Before
Unfinished portion of basement
Finished Basement
Millcreek flooring with ZenWall Panels
Finished Basement
Shower install with Millcreek Flooring with Everlast Wall Panel System and Drop Ceiling
Finished Basement
Millcreek Flooring with ZenWall Panels and Drop Ceiling
Finished Basement
Millcreek Flooring with ZenWall Panels and Drop Ceiling