Excavator
A photo of the excavator used to dig out the dirt against the building.
Pit
The large pit dug out to begin the installation of the Push Piers.
Trucks
A photo showing the company trucks at the scene.
Teamwork
Our team carving out pieces of hardened soil and concrete to be able to install the needed Push Piers.
Before Photo
The grassy area before being dug up for the install.
Complete
The dirt was levelled back out.
Completed Project
After the Push Piers were installed, the large hole was filled back in with dirt, and the area was graded and levelled.
Pier Installation
A photo of the Push Piers before the pit was filled in with dirt again.
Push Piers
These piers were successfully installed, reinforcing the foundation of the apartment building.
Crew
A photo of a couple of our installers.